|
Thorpe park was open for this half term so I went to have a look. The only rides open were:
Stealth, Vortex, Zodiac, Colossus, Quantum, Depth Charge, X:\No way out, Octopus garden, Storm in a teacup, Chief rangers carousel and Mr. Monkeys Banana Ride.
The whole of Canada creek was closed off including Samurai. Rumba rapids has stopped being sponsored by Ribina so all the ribina logos have been removed. Also Stealth has been mad faster going 0-80 now in under 2 seconds. Some work was going on in the nemesis inferno tunnel and also land was being filled aroung samurai for the 2009 coaster. Construction of Flying fish was almost compleate. Click here to see the construction photo's.
Take a look at the pictures below. Click on the images to emlarge.
|
|
|
|
|
|
|
|
Tidal wave has no water.
|
Another veiw.
|
A waterless splash run.
|
Empty turn.
|
No water in the staition.
|
A closer veiw.
|
|
|
|
|
|
|
|
Rumba Rapids has a new sign without the ribina logo.
|
Another new sign.
|
An empty rapids.
|
Another shot.
|
Another shot.
|
The main sign has had the ribina logo removed.
|
|
|
|
|
|
|
|
Land filling for 2009 coaster by colossus.
|
Another veiw.
|
Another shot.
|
And another shot.
|
A chanel of water has been left going towards colossus.
|
Some work going on inside nemesis inferno tunnel.
|
|
|
|
|
|
|
|
Samuri is podless.
|
Slammers top is still missing.
|
Stealths sign has not been changed since its upgrade.
|
Advertising Discoved this Easter.
|
Detonator's seats are off.
|
Another shot.
|
|
|
|
|
|
|
|
Some of the seats.
|
Another veiw of detonator.
|
The new bar in the dome 'Glass house'.
|
Land has been cleared for the hotel construction.
|
Tidal wave and stealth in the sunset.
|
Stealth in the sunset.
|